Street Maintenance

  1. Concrete Work
  2. Asphalt Paving
  3. Crack Sealing
  4. Hot Applied Chip Seal
  5. Slurry Seal

Safer Sidewalks, Curbs, and Gutters for Your Neighborhood


Crews will be in your area smoothing sidewalks, removing cracks that might have formed in your gutters, and fixing areas where water has started pooling. Spray paint will mark the areas scheduled to be fixed, so if the area in front of your home is marked, please read through this brochure so you can know what to expect. We appreciate your patience as we work to improve your neighborhood. 

Why Do We Replace Concrete?

  • The concrete has lifted or separated and has become a safety or traffic hazard 
  • The concrete has deteriorated, and the material beneath has come loose  
  • Water has gotten deep into the concrete through major cracks, compromising its safety 
  • The gutters no longer do their job, and water has begun pooling into the streets or sidewalk

How to Prepare for the Project:  

  • If you see spray paint marking the concrete in front of your home, that means it will be replaced. 
  • Before work begins, please remove any decorations and landscaping that’s within 12 inches of the sidewalk. Crews will do their best to not damage plantings like flowers and bushes, but it’s best to remove them and replant them when the work is done. 
    • If the contractor thinks your bushes or retaining wall are in the way, they will try to talk with you before beginning work, but because they might not be able to reach you, removing/trimming the area is advised. 
    • Please be advised that the concrete project, due to its nature and the necessary construction activities, may potentially impact nearby trees, including their limbs, branches, and root systems. While precautions will be taken to minimize disruption, some damage is possible. The contractor and the City are not responsible for any damage to private trees, and property owners should take steps to protect their trees if concerns exist.
    • We won’t replace any decorations or landscaping that gets damaged while crews are working, but if they do disrupt your lawn, the contractor will put down topsoil to allow grass to grow back naturally. 
  • Please mark all of your sprinkler heads in the area so crews can see them and can do their best to avoid damaging your irrigation lines while working. 
  • Please delay watering your lawn for up to four hours after new concrete is poured to so the concrete can set. 
  • You can return all landscaping materials back after the concrete work is done. 

What to Expect After Concrete is Poured:

  • Please do not walk or drive on concrete for three days so it can cure correctly, minimizing issues in the future. 
  • Please test your sprinkler system after the concrete has cured. 
    • If you notice any damage, let the contractor know as soon as possible so they can fix it 
    • Weather permitting, repairs will be made within seven business days of concrete replacement 
    • You will not be reimbursed if you have a 3rd party repair your sprinklers  

All replaced concrete will be ADA compliant and will be restored to its proper grade. When finished, this may mean your driveway and/or sidewalk won’t line up exactly with the new concrete. It will be the homeowner’s responsibility to level the concrete that is outside of the City’s right-of-way, if the homeowner wants it leveled. At times, E & M Concrete may be able to support private concrete needs to level driveways and/or sidewalks. You can reach them at 303-419-1820.

Paving in the Trailside neighborhood is scheduled to begin as early as Tuesday, February 10, 2026..

View the Trailside Paving Map for details.

Contact us

Pavement Engineering  
Email the Engineering Team 
303-658-2528

View an interactive map of our current street projects.

PWU Oak Street Paving
  1. Adopt-A-Street
  2. Potholes
  3. Street Sweeping

Any civic-minded group or individual is welcome to adopt a street. The Adopt-A-Street Program requests each group sign up for a one-year commitment, which can be renewed annually. Each group will be supplied with an ample amount of reflective vests to be worn during their clean-up times and orange bags for the groups to use in the collection of trash/debris.

Please see the program rules and fill out the application (PDF).

Questions: Email the Street Operations Department or call 303-658-2501